North Coast Energy was Sub Contracted by Progressive Ventures for the Earlyworks Project at Red Chris Mine.
Scope: North Coast Energy was contacted by Progressive Ventures in helping them execute a multi-sized pipeline for the Early Works Project at Red Chris mine. The installation consisted of Benching and installing over 6 km of multi-size pipe lines for the Raw water and Dewatering lines to help in its drilling activities underground.
The required fields included:
- Fusion of over 400 HDPE Joints
- Installation of 6000m of piping
- Development of multi-pump configuration
- Organizing and planning for the Benching and building of over 6000m of new routes for the piping
- Working in extreme elements
- Working with the Engineering teams to bring the system to an automated and the use of Electrically driven pumps for the use of Greener energy
Project Length: Oct 2021 – Mar 2023
Workforce Size: 7 workers